The Hydrology

HYSTAR Model Runner

0 available USGS watershed sitesAutomatic compute assignment

Prepare watershed inputs, run the model, and retrieve results.

Work from left to right through four clearly separated stages. Prepare the required inputs, optionally configure one or both scenarios, run the model, and then review the results.

Starting the portal. Controls become available when it is ready.

Step 1 of 4 · Input data preparation

Select the watershed and prepare model inputs

Choose a watershed. The baseline section checks its prepared inputs. Production dates await the owner’s instructions; dates shown here are for catalog exploration.

Status:Needs informationInput data complete
Needs information
Watershed selected

Showing 0 individual USGS basins in USGS region .

USGS site

0 km² · site record ready for model preparation

USGS region

State is assigned from the outlet location · 0.000, 0.000

Valid dates needed

Loading available USGS watershed sites.

Prepared input variants can be checked in the connected baseline section below. The displayed dates are catalog metadata; production runs await the owner’s approved dates.

Rainfall chart loads as you approach it

Step 2 of 4 · Scenario analysis

Explore optional land-cover and selected-cell scenarios

Use either analysis by itself or configure both in the same run. Leave both inactive for a baseline simulation.

Status:Inactive or needs a selectionScenario active and complete
Scenario inactive

Land-use and cover scenario

Change one model cell or a drawn area. HYSTAR recalculates CN from the replacement cover and each cell's soil group.

Optional · no change

Enter a U.S. street address inside the selected watershed. The native model cell at the selected point will be used.

Address lookup: U.S. Census Bureau Geocoding Services.

No land-cover cell or polygon selected

The scenario is applied to a per-job working copy. Original HYSTAR and watershed input files are not changed.

Selected-cell flow path and impact

Trace one model cell to the outlet and quantify its direct-runoff contribution with a controlled rainfall experiment.

Optional · not selected
Start by choosing one of the two impact analyses above. The portal will then guide you to select exactly one model cell.

Watershed map and area selection

Land-cover areas are pink; the independent impact-analysis cell is teal. Both can remain selected.

Land-cover area optionalImpact cell optional

Loading watershed catalog

The map becomes available as soon as the USGS catalog is ready.

Point-to-outlet flow path

Select a point or model cell on the map, then trace its native D8 route to the main modeled outlet.

Select a point on the map first.

Uses the supplied flow-direction and accumulation grids. Length follows native cell centers; this tool does not estimate travel time.

Review previous results

Completed scenarios saved for USGS/. These shared results can be reopened on another device.

Choose a run to open its hydrographs, summary table and downloads in Watershed Analysis. Dates above use UTC. A saved run retains its original simulation period and resolution.

Run the selected land-use scenario

Uses the cell or polygon and replacement land use selected in Step 2. A map point is resolved to its actual prepared model cell; polygons select active native cell centers within the watershed.

Checking the previous scenario run…

Preliminary simulation based on uncalibrated HYSTAR model outputs. Results are exploratory, not forecasts or decision-ready predictions. Cell-contribution and travel-time analyses are separate from this land-use scenario.

Step 3 · HYSTAR baseline

Check inputs and submit the watershed

Using the watershed selected above: choose a watershed . Choose its prepared model variant below. Save the return link to check progress later.

Workstation: offline or connecting · Up to 4 watersheds concurrently, one model thread each, subject to available memory.

Modeling dates are awaiting the owner’s instructions. Selections run input checks only; simulations are on hold.

0 input-complete dataset entries. White = completed approved baseline; gray = results pending. Input checks do not mean a model has completed.

04

Step 4 of 4 · Retrieve results

Review hydrographs and download result files

Completed baseline results show two years of direct runoff and baseflow, excluding warmup. Download the discharge series below. Land-use scenario hydrographs and summary comparisons appear below when their runs finish.

Status:No resultsModeling in progressResults ready
No results

Available first-event simulation · selected watershed

· ·

Selected watershed: USGS/

· 0 km² ·

Preliminary simulation based on uncalibrated HYSTAR model outputs.

Loading the cataloged first-event output…

Result charts load when this section comes into view.